Ken Klima - Kitfox 3.5

 

 

Started in 1990 and finished in 1995 after about 1200 hours of build time, Ken now has almost 700 hours
including a trip to Sun-N-Fun.  He has flown into every Oshkosh since 1996 and to most airports in the state.
Powered by a Rotax 582 the Kitfox cruises at 85 MPH bucking head winds both ways.  Favorite pastime
is attending pancake breakfasts.

Opening the Box

Sandblasting the Fuselage

Undercoating the Fuselage Weldment

Wing Assembly

Wing Assembly

Insturment Panel after Hole Cutting and Fabrication

Professional Pain Booth

Covering Fuselage

Covering Fuselage

Covering Wing

Wing After Covering

Painting Stripe on Fuselage

Painting UV coating on Wings

Engine Assembly

Cowl Fitting

Engine Installation

Assembly Day

Wing Attachment

Luxureious Interior

It FLYS!!!

Instrument Panel in Flight